What Should You Check When Auditing a Mold Factory Before Placing an Order?
A factory audit before the deposit is the only way to verify that the quotation matches the capability on the shop floor. The audit is not about counting machines or taking photos for the procurement file — it is about answering one question: can this factory build the specific mold you need, at the tolerance your drawing requires, and deliver it on the schedule they quoted?
Cycle time — The total time for one injection molding cycle: injection + packing + cooling + mold open/close + ejection. Typical range: 15–60 seconds. Cycle time determines production rate and cost per part — reducing cycle by 5 seconds saves 10–15% annual production cost. See also related guide.
Key Facts