Injection Mold Maintenance Schedule — What Should Be Inspected Daily, Weekly and by Shot Count?
Mold maintenance follows a tiered schedule: daily checks (visual inspection, cleaning parting line, checking ejector return), weekly checks (lubricating guide pins and slides, inspecting vents), and shot-based maintenance (disassembly and inspection at 50,000, 100,000 and 250,000 shot intervals) — the schedule is determined by the mold’s complexity, the resin being molded and the operating environment. A documented maintenance schedule extends mold life by 2–3× and prevents unplanned downtime from progressive wear that goes undetected until it causes a production defect.
Cavity — The hollow space inside the mold that forms the part shape. Multi-cavity molds produce multiple parts per shot. Cavity count determines production output but also mold cost and complexity. Each cavity must be balanced for uniform fill. See also related guide.
Key Facts