Last updated: 2026-09-02 · 5 min read
Shipping an Injection Mold from China — What Are the Options, Costs and Lead Times for Sea, Air and Rail Freight?
Sea freight from Shenzhen to the US West Coast takes 18–25 days and costs $800–2,500 per crate; air freight takes 5–8 days and costs $3,000–8,000 for a typical mold; rail freight to Europe takes 18–22 days via the China-Europe Railway Express and costs $2,000–5,000. The shipping method affects the total landed cost and the project timeline — and the choice depends on the mold size, the urgency and the destination.
For a 500 kg mold going to Germany, sea freight at $1,200 and 28 days may be the best value; for the same mold needed in 7 days, air freight at $5,000 is the only option.
Gate vestige — The visible mark left on the part surface where the gate was trimmed. Edge gate: 0.5–2.0mm vestige. Pin-point gate: 0.2–0.5mm. Valve gate: 0.05–0.1mm (flush). Vestige size affects cosmetic appearance and may require secondary trimming. See also related guide.
Key Facts