Last updated: 2026-09-02 · 5 min read
How Do You Evaluate an Injection Mold Supplier in China — What Evidence Matters More Than Claims?
Evaluating a Chinese mold supplier requires five evidence-based checks: reviewing T1 samples and CMM reports from past molds (not brochure claims), verifying the equipment list against the part requirements (CNC, EDM, CMM — not machine count), checking the engineer-to-worker ratio (design capability, not headcount), requesting customer references with contactable names (not anonymous testimonials), and confirming export packaging and logistics experience (not just FOB capability). The suppliers who pass all five checks are the credible alternatives to local toolrooms — the rest are quoting on price alone.
Runner system — The channel network that delivers melt from the machine nozzle to each cavity. Cold runner: solidifies between shots, produces runner waste. Hot runner: stays molten, eliminates runner waste but adds $15k–$40k to mold cost. See also related guide.
Key Facts